University Wastewater Line Replacement - September 2020

University-LocationMap2
  • All utility crossings have been pot holed
  • Approximately 30% of the proposed wastewater main has been installed
  • The existing wastewater main had deteriorated and needed to be replaced
  • Construction is occurring along University Drive from Moon Street to N. LBJ and along N. LBJ from University to Concho Street 
  • Traffic is detoured to Hutchison for the duration of the project with University buses allowed to use N. Edward Gary for Texas State campus access