About the Project

Construction to begin March 2020


  • Reconstruction of Hopkins Street from Bishop to Moore Street. Includes traffic calming design with reduced roadway section and three raised intersections. 
  • Water and wastewater lines will be replaced. Drainage is a key component to the project where no infrastructure exists. 
  • Storm inlets will be installed throughout the project tying into the Travis Drainage Outfall Project